We’ve had the great opportunity of working with a variety of organizations to identify their best acoustical treatment.
Interested in learning more? Take a look at our client case studies and testimonials.
Here are some of the great organizations we’ve helped:- Aldi: Investigation and assessment of noise from refrigeration plant.
- All England Lawn Tennis & Croquet Club: Centre court commentary box air conditioning, radio interview studio, plant attenuation, and vibration isolation.
- Asda: Assessment and achievement of suitable noise levels from refrigeration and air conditioning plant.
- BBC: Stainless steel cooling tower attenuation systems at their television centre.
- Co-op: Assessment and achievement of suitable noise levels from refrigeration and air conditioning plant.
- Ford: Attenuation of noise from external plant.
- The Gherkin: Cooling tower attenuation and vibration investigation.
- Lidl: Investigation and assessment of noise from refrigeration plant.
- MEN Arena: Vibration isolation systems to reduce noise from plantroom to offices below.
- Millennium Dome (O2 Arena): Main extract fan attenuation.
- Morrisons: Quiet Delivery System development, plant noise control, planning application/ appeal support.
- National Grid: Engineer high performance acoustic enclosures for cable tunnel cooling fans.
- Rolls Royce: Engineer and install a 10m high Acoustic Partition separating Turbine Blade Production from Quality Control and other noise sensitive areas.
- Sainsburys: Refrigeration plant acoustic containers; noise complaint investigation and resolution.
- The Shard: Cooling Tower vibration isolation (FlexiRails).
- South Cambridgeshire District Council: Acoustic support for guided busway, expert witness representation for wind farm appeal, complaint investigation, attenuation for noise within offices.
- Tesco: Engineer and install refrigeration plant acoustic containers.
- Waitrose: Engineer and install refrigeration plant acoustic containers; noise complaint investigation and resolution.
- The Walkie Talkie: Cooling Tower vibration isolation (FlexiRails).